Hoisting and Rigging Calculations:
  • Large Building Components Must be Assembled in Field
  • Improper Hoisting May Cause Failure of Components
  • Temporary Bracing of Building Members May Also be Required
  • A Proper Hoisting Plan Must Consider All Aspects of the Structure
  • A Stable Structure Must be Maintained Throughout Construction
  • A Reduction in Design Loading is Usually Acceptable for Construction
  • The Extent of Reduced Loading is Usually Based on Construction Time
  • Finite Element Analysis [STAAD] is Usually Required For Complex Systems
Hoisting Loads for Large Steel Truss
Click on Sketch
to View in PDF
Click Pics To
Enlarge
Daniel F. Ardito, PE
Professional Engineer
5644 S Plantain Pt
Lecanto, FL 34461
STRUCTURAL BUILDING DESIGNS
Click
Pics To
Enlarge
Hoisting and Rigging Calculations
OSHA Construction Safety
Hoisting
Hoisting
Monopole
** email: danardito@tampabay.rr.com **
(352)-621-4915
*** SKYPE Callers - Please Leave Message or Use Email ***
I Will Not Answer Calls With "No Caller ID" or "Vague Caller ID" Due to the High Volume of
Telemarketing Calls in Recent Years.  Leave a Message With Name, Number, and Message.  Thankyou
Ph: (352)-621-4915
danardito@tampabay.rr.com
Call Today to Discuss Your
Project Design Needs