Building in the Flood Zone:
- FEMA Codes Require Lowest Floor Above Flood Elevation
- All Living Spaces Must be Above Flood Elevation
- Construction Below Flood Elevation Cannot Obstruct the Flow of Water
- No Electrical Below Flood Elevation
Building in Flood Zone - V:
- Most Likely Will Require Pilings, Grade Beams, and Stilts
- Design for Breaking Waves is Required
- Higher Design Wind Exposure is Required
- Breakaway Walls are Required
- Breakaway Slabs are Required
- No cut or Fill of Soils
- Elevators can be Installed in a V-Zone
V-Zone Piling Plan & Wall Section
|
Click on Sketch to View in PDF
|
Daniel F. Ardito, PE Professional Engineer 5644 S Plantain Pt Lecanto, FL 34461
|
STRUCTURAL BUILDING DESIGNS
|
Flood Zone Designs: A & V FEMA Code Compliant Designs
|
** email: danardito@tampabay.rr.com **
|
*** SKYPE Callers - Please Leave Message or Use Email *** I Will Not Answer Calls With "No Caller ID" or "Vague Caller ID" Due to the High Volume of Telemarketing Calls in Recent Years. Leave a Message With Name, Number, and Message. Thankyou
|
Ph: (352)-621-4915 danardito@tampabay.rr.com
|
Call Today to Discuss Your Project Design Needs
|